References

In our first 10 years, we are provided our services to numerous clients among which we highlight: HEP ODS Ltd, University of Split, Airport Split, Slobodna Dalmacija , VIPnet Ltd, HT, Tomic & Co. Ltd. (BMW Croatia), Valamar Riviera, LIDL Ltd, Lesnina Croatia Ltd, Plovput Ltd., MEDILS Institute and many others.

DESIGN

RESIDENTIAL AND COMMERCIAL BUILDINGS

  • Residential and commercial building Sućidar, Split, main design, April 2006.
  • Residential buildings S1-1, S2-2 and S2-3, Split, main design, December 2006.
  • Residential and commercial building in Solin (phases I and II), main design, April 2007.
  • Residential and commercial building on Mejasi, Split, main design, June 2007.
  • Residential building in Seget, main design, September 2008.
  • Residential buildings POS (A, B, C), Nerežišća, main and detail design, January-April 2009.
  • Semi-detached apartment and office building in St. Kajo, Solin, main design, June 2009.
  • Two urban villas with swimming pools in the Old Town, the island of Hvar, main design, April 2010.
  • Residential building “Vlasic”, Podstrana, main design, May 2011.
  • Residential building, “Petrovic”, Podstrana, main design, June 2011.
  • Residential complex in Sinj, preliminary design, February 2012.
  • Residential and commercial building in Slatina, main and detail design, April 2012.
  • Residential and commercial building in Kman, concept design, september 2012.
  • Residential building “Tonšić”, Bol, main design, November 2012.
  • Residential building on Znjan, preliminary design, December 2012.
  • Residential and commercial building in Kaštela, preliminary design, March 2013.
  • Residential and commercial building in Split, preliminary design, July 2013.
  • Residential and commercial building “Surface”, Split, preliminary design, July 2013.
  • Vacation rentals in Cazma, main design, October 2013.
  • Double multiflat building “Zaputović”, preliminary design, November 2013.
  • Luxury residential building, Podstrana, main design, November 2013.
  • Luxury residential building, Bol, detail design, June 2014.
  • Adaptation of the building ex “Narodne novine” Split, preliminary, main and detail design, November 2014.- December 2015.
  • 3x multiflat residential building in Solinu, preliminary and main design, may-november 2016.
  • Multiflat residential building GRIPE in Split, preliminary and main design, december 2017.
  • Multiflat residential building DEGERO IV in Solin, main design, february 2018.
  • Residential and commercial building KOLODVOR in Omiš, preliminary, main and detail design, may 2018. – august 2019.
  • Residential and commercial building VELEBITSKA in Split, preliminary and main design, february 2019.

BUSINESS BUILDINGS AND FACILITIES

  • High economic administration school, Split, main design of reconstruction, May 2006.
  • Community Centre Nerezisca, main design, April 2007.
  • Medical institutions with accommodation, Split, main design, July 2007.
  • Annex of Primary School High, Split, the project, September 2007.
  • Annex of Primary School Metkovic, Metkovic, main design, October 2007.
  • Annex of the Centre “Juraj Bonaći” Split, main design, December 2007.
  • Centre for Social Welfare Krk, main and detail design, January 2008.
  • Reconstruction of the VI floor of the General Hospital in Dubrovnik, main design, March 2008.
  • Reconstruction of the restaurant in the “Jezera” ACI Marina, main design, March 2008.
  • Gallery “Cetinić” Blato, island of Korcula, detail design, June 2008.
  • Cultural Centre on Brda, Split, main design, November 2008.
  • Kindergarten on Brda, Split, main design, December 2008.
  • Reconstruction of Elementary School Proložac, Proložac, main design, March 2009.
  • Commercial building nautical center, Seget Donji, Trogir, preliminary design, March 2009.
  • Ambulance and a magnetic resonance imaging at the General Hospital Dubrovnik, detail design, May 2009.
  • Kindergarten St. Kajo, Solin, main design, May 2009.
  • Kindergarten on Brda, Split, main design, July 2009.
  • Monastery in Orebic, Peljesac, main design, September 2009.
  • Reconstruction of the warehouse building of the University of Split, Kopilica, preliminary, main and detail design, April-July 2010.
  • Commercial building BMW, Split, main and detail design, August 2010 – December 2011.
  • Commercial Building “Bershka”, Split, main and detail design, February-July 2011.
  • Fire alarm installation PC “Građa”, Sibenik, detail design, May 2011.
  • Reconstruction and Annex of of the monastery in Kamen, Split, main and detail design, October 2011 – January 2012.
  • Commercial building “Dracomerx” Solin, detail design, December 2011.
  • Nursing home in Ljubitovica preliminary design, July 2012th
  • Commercial building in the Old Town, the island of Hvar, preliminary design, July 2012th
  • Commercial building shopping center in Imotski, preliminary design, July 2012th
  • Annex of the system to protect against lightning at business building in Kaštela, detail design, September 2012th
  • Upgrade of the office building “Čulić electrical center”, Solin, main design, October 2012th
  • Adaptation of the kindergarten in Bol, preliminary design, March 2013., main desig June 2015.
  • Adaptation of the cultural center in Bol, preliminary design, May 2013., main design, November 2015.
  • Adaptation of the lighthouse Glavat, detail design, June 2013.
  • Shopping center “Lesnina” Zadar, preliminary, main and detail design, February-July 2013.
  • Town hall in Trpanj, main design, September 2013.
  • Shopping center TOMMY, Stari grad, island Hvar, main design, September 2013.
  • Adaptation of the attic of the building of the University of Split, detail design, November 2013.
  • Home for the elderly in Dugopolje, preliminary, main and detail design, July 2013 – January 2014.
  • Marina Podgora, preliminary, main and detail projects, April 2013 – in progress
  • Business Incubator Klis, main design, June 2014.
  • Camp “Rastovac”, center, preliminary design, June 2014.
  • Home for the elderly and disabled, Stobreč, main design, July – October 2014.
  • Reconstruction of Tourism’s Palace in Split, preliminary, main and detail design, March-October 2014.
  • Reconstruction of the “JNA house” in high school, Vis, main design, November 2014.
  • Adaptation of part of the space MEDIL’s, Split, November 2014 – June 2015.
  • Shopping center „Lesnina“ Pula, preliminary and main design, march – july 2016.
  • Adaptation of ex cinema Central into night club, detail design, may 2016.
  • ACI marina Rovinj, main design, june 2016.
  • Reconstruction of lightning protection system of lighthouse Palagruža, detail design, november 2016.
  • Reconstruction of warehouse building ex METRO in Dugopolje, detail design, january 2017.
  • Shopping center „Lesnina“ Dugopolje – reconstruction, preliminary and main design, february – july 2017.
  • Shopping center „Lesnina“ Sesvete – rconstruction, preliminary and main design, february – july 2017.
  • Energy renewal of northern building of Split University in Kopilica, detail design, december 2017.
  • Reconstruction of warehouse building Studenac in Dugopolje, detail design, february 2018.
  • Reatail center STUDENAC in Grohote, Šolta island, main design, march 2018.
  • Ferry harbor Dominče, Korčula island, main design, march 2018.
  • New harbor Polačište, Korčula island, preliminary design, march 2018.
  • Bussines building („entrepreneurial incubator“) in Čaporicama, main design, june 2018.
  • Renewal of King Christ church in Selca, Brač island, detail design, june 2018.
  • Marina in Vela Luka, Korčula island, detail design, july 2019.

HOTELS

  • Hotel “President”, Solin, main design, June 2007.
  • Hotel “Mardešić”, Sali, island Dugi otok, December 2007.
  • Depadansa hotel “Bastion”, Zadar, main design, in October 2010.
  • Boutique Hotel “Winery”, Nerezisca, Brac Island, main design, in December 2010.
  • Hotel 3 * “Bajic”, Grad – Split, main design, in March 2011.
  • Reconstruction of “Maškovića han” Vrana, main design, in May 2011.
  • Hotel 5 * “Bačvice”, Split, main design, in July 2011.
  • Hotel 4 * “Ruskamen” Ruskamen, main and detail design, November 2011 – May 2012.
  • Eco Hotel 4 *, Plitvice, preliminary design, December 2011.
  • Hotel complex with three 4 * hotel, Makarska, preliminary design, March 2012th
  • Eco Hotel 4 *, Plitvice, main design, December 2012th
  • Hotel 3 * in Split, preliminary and final design from January to March 2013.
  • Aparthotel 4 * and annex at Podstrana, preliminary design, October 2013.
  • Hostel 4 * and annex in Kaštela, main design, September 2015.
  • Hotel “Romana” – Phase I in Makarska, preliminary, main and detail design, April 2015. – in process
  • Aparthotel 3* „Ursus magnus“ in Korenica, main design, travanj 2018.
  • Hostel 3* in Zadar, detail design, may 2018.
  • Hotel 4* „Central“ u Splitu, main and detail design, september 2018. – september 2019.
  • Hotel 4* in Imotski, main and detail design, october 2018. – november 2019.

INDUSTRIAL PLANTS

  • Server room “Iskon” at Split, detail design, June 2006.
  • Warehouse and distribution center of dry construction “Baustoff metal,” Kastel Sućurac, main design, July 2006.
  • Commercial building “Slobodna Dalmacija”, Split, preliminary, main, detail and as-build design, October 2006 – February 2008.
  • Production hall in Okrug Gornji, main design, May 2008.
  • Commercial building with two halls, “Doka”, Split, main design, September 2008.
  • Commercial building for glass processing “Unija nova”, main design, February 2010.
  • Oil Mill “GRIKULA” Pučišća, main design, December 2010.
  • Industrial building and fish processing plant “Šangulin” Biograd n / m, December 2010.
  • Storage Hardware Store “Delmarco” Muć, main design, March 2011.
  • Industrial building “HPB”, PZ Čaporice, main design, May 2011.
  • Factory for processing of fruits with the necessary facilities, “Stella mediterranea”, preliminary, main and detail design, June 2012 – February 2013.
  • Reconstruction of the boiler room in the center of HP, Split, detail design, January 2014.
  • Industrial plant GUMIS in Spolin, main and detail design, may 2016. – june 2017.
  • New transformer substation TS 6/0,4kV in INA oil rafinery in Rijeka, main and detail design, march – july 2017.
  • Reconstruction of orthopedical surgical block in KBC Split, detail design, december 2017.
  • New bridge „main land-Čiovo island“ near Trogir (bridge automation and traffic signalisation), detail design, february 2018.
  • Energy renewal of industrial plant furniture factory „Naprijed“ Sinj, february 2018.
  • Reconstruction of piers in marina „Dalmacija“ in Sukošan, main design, september 2018.
  • Extension of the dock in harbor Unije, Mali Lošinj island, main design, february 2019.
  • Waste management center „Bikarac“ near Šibenik, main design, august 2019. – in progress
  • Reconstruction of hospital emergency admission in KBC Split, main design, september 2019. – in progress

TRANSFORMER SUBSTATIONS (TS),CABLE (KB) AND OVERHEAD (DV) HIGH VOLTAGE (10, 20, 35kV) FACILITIES AND LINES

  • 70x 10 (20) / 0,4 kV in the area of the DP Elektrodalmacija I DP Elektrojug, detail design, April 2007 – May 2012.
  • 45x KB outcome 10 (20) kV in DP Elektrodalmacija, detail design, April 2007 – November 2012th
  • 18x DV resolution of 10 (20) kV in DP Elektrodalmacija, detail design, April 2007 – November 2012th
  • The system for secondary equipement fields = H18 and H19 = in 110 / 35kV “Kaštela”, detail design, January 2007.
  • KB outcome 10 (20) kV “Vis” (8 cable shares), the main-detail design, April – August 2008.
  • KB 10 (20) kV substation 35 / 10kV “Sinj” – Work Zone Dicmo, detail design, in April 2008.
  • KB outcome 10 (20) kV substation “Lower humac 1” – TS “Lower humac 6”, the detail design, in March 2008.
  • KB outcome 10 (20) kV Work zones “Dicmo” (2 cable section), the main-implementation project in June-August 2008.
  • KB outcome 35kV, 10 (20) kV “Dujmovača-Shipyard-Dalvin” (3 Cable shares), the main-detail design, August 2008 – February 2009.
  • KB outcome 10 (20) kV “Makarska” (3 Cable shares), the main-detail design, Jan. – February 2009.
  • KB outcome 35kV, 10 (20) kV “Pain-Murvica (phases I and II)”, the main-detail design, July 2009, in February 2010.
  • KB resolution of 0.4 kV in Kopilica, with the reconstruction of readings, preliminary study, September 2011 – March 2012th
  • Reconstruction of two 10 (20) / 0.4 kV at Split Airport to implement the “automatic reconfiguration of network (ARM) – smart grid”, detail design, May 2012.
  • Reconstruction (replacement of MV switchgear) for five (5) transformer substations 10 (20) / 0,4 kV on the Babin Kuk, detail design, September 2012th
  • Reconstruction (replacement of transformer and MV switchgear) in 10 (20) / 0.4 kV Rogoznica, detail design, March 2013.
  • 10 (20) / 0,4 kV “Stream” and the power cord 10 (20) kV, Korcula, the main-detail design, May to kolovoz 2013.
  • The project of removing part of the submarine cable 10 (20) kV Komardi, Dubrovnik, main design, January 2014.
  • TS 35 / 10kV “Žedno”, preliminary design, July 2014.
  • Relocation of overhead line DV 10kV in Seget donji, main design, january 2016.
  • Reconstruction of existing overhead line DV 10kV for STS 10(20)/0,4kV „FARMA 2“, may 2019.

BASE STATIONS OF MOBILE COMMUNICATION

  • 32x main stations of mobile communication in the area of Zadar and Ploce, the main-detail design, technical solution for reconstruction, August 2008 – December 2010.

SOLAR PHOTOVOLTAIC POWER PLANT

  • PV power plant of 30 kW on the roof of an existing warehouse, Korcula, preliminary design – a study, a technical solution with an economic analysis of profitability, December 2010.
  • Two family house in Vinisce with network PV power plant on the roof, October 2011 – january 2012.
  • Apartment house in Gdinj, the island of Hvar, with a hybrid PV system, detail design, May 2012.
  • PV power plant on the roof of the planned plant for the production of food products in Klis, 9.8kWp, detail design, March 2013.
  • PV power plant on the roof of an existing business hall in Split, 30kWp, preliminary design, December 2012th
  • PV power plant on the roof of the apartment and office building in Slatina, 4.6kWp, detail design, December 2012th
  • PV power plant on the roof of residential and commercial buildings in Dramalj, 10kWp, preliminary design, February 2013.
  • PV power plant withing enery renewal of elementary school OŠ Sklaice in Split, 20kWp, main design, may 2018.
  • PV power plant withing enery renewal of hotel „Soline“ in Brela, 200kWp, main design, july 2018.

OTHER (PUBLIC LIGHTING, ADAPTATION OF COMMERCIAL SPACES, URBANISTIC PROJECTS)

  • About 120 renovation and reconstruction of housing, restaurants and shopping areas in the area of Rijeka to Dubrovnik and Zagreb, main and detail projects, September 2005 – November 2015.
  • Lighting football field NK Sloga, Mravince, detail design, August 2006.
  • Lighting promenade Lokvice-care (Phase III), Trogir, detail design, December 2006.
  • Public lighting of the street at Dracevac, Split, detail design, February 2007.
  • Lighting tennis courts TK “Firule”, Split, detail design, April 2007.
  • Public lighting Zmijavci, detail design, April 2007.
  • Type-field of public lighting, detail design, April 2007.
  • 10x project relocation fields of public lighting from 10 (20) / 0,4 kV in the area of Split and Slatina, detail design, April-July 2007.
  • Public lighting Ante Starcevic Street in Žrnovnici, detail design, April 2007.
  • Public Lighting road Donji humac – quarry, main design, March 2008.
  • Public lighting LC67162 of Bublina to the intersection with County road 6182, Zmijavci, detail design, in June 2008.
  • Relocation of public lighting for reconstruction driveway in GK “Dragovode”, Split, detail design, October 2008.
  • Breakwater and three piers in Lukoran, Municipality Preko, Ugljan, detail design, December 2008.
  • 8x UPU in the area of District Čiovo and Seget, May 2008 – February 2009.
  • 5x UPU in the City of Makarska, May 2011 – December 2011.
  • 2x UPU in the Municipality Vučevica, September 2011 – February 2012th
  • Reconstruction of the business premises Plopvut d.d. the control centers and supervision of Split and Dubrovnik, the detail design, in February 2010.
  • Public lighting, LV distribution and DTK street JP6 and JP7 in Split, major projects, November 2010, executive projects, in May 2011.
  • Harbor local population Preko, Ugljan, preliminary design, in November 2010.
  • Port of nautical tourism related facilities in Okrug Gornji, preliminary and final design, September 2012 – July 2013.
  • Showroom KARE and beauty salon, Split, detail design, December 2012th
  • Adaptation of shopping centers Lidl in Knin and Imotski, detail design, February 2013.
  • Public lighting street Krešimirova, Tješimir and Gošanj, Podstrana, detail design, apr-May 2013.
  • Beauty salon CHIARA, Split, detail design, April 2013.
  • Adaptation of business premises VIPnet, 9 space by Croatia, September 2013 – in progress
  • Reconstruction of public lighting Municipality of Klis, July – October 2014.
  • Reconstruction of public lighting Municipality of Promina, July 2014.
  • Reconstruction of public lighting Municipality of Bale, July 2014.
  • Reconstruction of public lighting Municipality of Brtonigla, August 2014.
  • Reconstruction of public lighting Municipality of Vižinada, September 2014.
  • Reconstruction of public lighting Municipality of Marina, April 2015.
  • Reconstruction of public lighting Municipality of Lastovo, June 2015.
  • Reconstruction of public lighting Municipality of Nerežišća, July 2015.
  • Reconstruction of public lighting system of Municipality Lastovo, main design, june 2015.
  • Reconstruction of public lighting system of Municipality Tinjan, main design, december 2016.
  • 30x project of relocation fields of public lighting from 10(20)/0,4kV in the area of Split and Slatine, detail design, january – april 2019.

SUPERVISION

COMMERCIAL BUILDINGS

  • Residential buildings A and B, Solin, construction, April 2008.
  • Residential buildings 1 and 2, Mravince, construction, July 2008.
  • Residential building, Solin, construction, March 2009.
  • Semi-detached residential building, Solin, construction, August 2009.
  • Residential and commercial buildings Brda, Split, construction, November 2009.
  • Residential and business building Mejaši, construction, August 2010.
  • Residential building, Seget Vranjica, construction, September 2010.
  • Residential building, Trogir, construction, December 2010.
  • Residential building in Mravince, construction progress
  • Residential building in Chania, construction progress
  • Apartment building from the program POS, “KILA 3”, Split, October 2015.
  • Residential building in Dugi Rat, May 2015 – in progress
  • Residential building “Ribnjak 3” in Omiš, November 2015 – in progress
  • Residential building in Dugi rat, december 2017.
  • Residential building in Omiš, december 2017. (ove dvije već postoje u referenacama, samo im ažuriraj datume…)
  • Residential building in Podstrana, september 2018.- in progress
  • Residential building „23“ on Žnjan, february 2019. – in progress

BUSINESS BUILDINGS AND FACILITIES

  • City Hall Trogir, reconstruction, March 2007.
  • The youth, Split, reconstruction, June 2007.
  • Primary Mejaši, Split, reconstruction and extension, May 2009.
  • Elementary school Vladimir Nazor, Neviđane, island Pašman, reconstruction and extension, July 2009.
  • Economics and Administration School, Split, reconstruction, September 2009.
  • Primary Kamešnica, Island near Sinj, reconstruction and extension, January 2010.
  • Commercial building “Armator”, Split, construction, July 2010.
  • Commercial building “Aedilis”, Split, construction, July 2010.
  • ACI marina – office building, Split, building, August 2010.
  • Commercial building – warehouse, work zone Dicmo, construction, November 2010.
  • Secondary Medical School, Split, construction, September 2013.
  • The west coast of Split, Phase III, construction, June 2013.
  • Commercial building – warehouse with office space, work zone Dugopolje – Podi, construction, May 2013 – in progress
  • Commercial building LESNINA Zadar, Murvica PZ-South, March 2014 – November 2014.
  • Commercial building – plant for the production of food, Klis, December 2013.- June 2014.
  • Border check-point “Vinjani donji”, March – December 2015.
  • Commercial building – fish processing plant, Gizdavac, May 2015 – in progress
  • Border check-point Vinjani donji, march 2015. – august 2016.
  • Industrial plant – fish processing plant, Gizdavac, svibanj 2015. – siječanj 2016.
  • Bussines building HAKOM-a in Split, november 2015. – september 2016.
  • Reconstruction of warehouse building in Dugopolje, november 2015. – september 2016. (ove 4 već postoje, samo ažurirati datume)
  • Hotel NESTOS in Duće, september 2016. – january 2019.
  • Warehouse and distribution center STUDENAC in Dugopolje, november 2018. – november 2019.
  • Hotel CENTRAL in Split, march 2019. – in progress
  • Bussines building („entrepreneurial incubator“) UNIST in Split, july 2019. – in progress

TS, KB AND DV UNRAVELING 35 KV, 10 (20) KV

  • 38x 10 (20) / 0,4 kV in the area of the DP Elektrodalmacija and DP Elektrojug, construction, December 2007 – December 2012th
  • 22x KB outcome 10 (20) kV in DP Elektrodalmacija, construction, October 2008 – December 2012th
  • 13x DV resolution of 10 (20) kV in DP Elektrodalmacija, construction, October 2009 – December 2012th
  • 41x 10 (20) / 0,4 kV in the area of the DP Elektrodalmacija and DP Elektrojug, construction, december 2007. – december 2018.
  • 23x KB outcome 10 (20) kV in DP Elektrodalmacija, construction, october 2008. – december 2018.
  • 14x DV resolution of 10 (20) kV in DP Elektrodalmacija, construction, october 2009. – july 2019. (već postoje, samo ažuriraj broj projekata i datume…)
  • Preliminary design of transformer substation TS 10(20)/0,4kV, 5MVA in bussiness zone Ravča, november 2019.

OTHER (PUBLIC LIGHTING, ADAPTATION OF COMMERCIAL SPACES, URBANISTIC PROJECTS)

  • Public lighting Mišine streets, Split, construction, in April 2007.
  • Public lighting the Trieste streets, Split, upgrade, in April 2007.
  • Wiring Lovrinačke streets, Split, construction, July 2007 – August 2008.
  • 20x adaptations of business premises (< 200m2), individually or in the mall, construction, September 2007 – July 2015.
  • Public lighting plot no. 5 in Dragovode, Split, construction, in December 2007.
  • Public lighting Mejasi (Dračevac), Split, upgrade, in January 2008.
  • Public lighting Mišine streets, Split, construction, in April 2007.
  • Public lighting car parks at the Molise Croatian, Split, construction, in January 2008.
  • Public lighting street Ante Starcevic, Žrnovnica, construction, in April 2008.
  • 14x base stations of mobile communications, construction, November 2011 – July 2014.
  • Reconstruction of public lighting Municipality of Tinjan, July – August 2015.
  • Reconstruction of public lighting Municipality of Vižinada, August 2015 – October 2015.
  • Reconstruction of public lighting Municipality of Podbablje, april 2016.

ENERGY AUDITS AND CERTIFICATES

PUBLIC BUILDINGS

  • Home for Children “Maestral” Split, energy audit, September 2012th
  • Children’s Home “Brda”, Split, energy audit, September 2012th
  • Home for children and persons with special needs, “George Bonaći”, Split, energy audit, October 2012th
  • Home for children and persons with special needs “Mir” Rudine, energy audit, October 2012th
  • Home for children and persons with special needs “Josipovac”, Mills, Mandaljena energy audits, November 2012th
  • Home for the elderly and the Centre for Social Welfare, Metkovic, energy audit, November 2012th
  • Public buildings House of Culture “Zvonimir” Solin, an energy audit and certification, December 2012th
  • Public buildings FESB, Split, energy audit, December 2012th
  • Public buildings High School “Ivana Mestrovic”, Drnis, February 2013.
  • Public buildings, “Health”, Knin, February 2013.
  • Public buildings kindergarten in Drnis, energy audit, April 2013.
  • Public buildings, “Faculty of Law”, Slit, Energy Report, November 2013.
  • Public buildings “Civil Engineering”, Split, Energy Report, May 2014.
  • Culture, Drnis, March 2014.
  • City Museum, Drnis, March 2014.
  • Residential complex Dubrovačka 14,16,18,20 in Split, april 2019.
  • New terminal of Airport Split, august 2019.

BUSINESS BUILDINGS

  • Hotel “Osmine” – the bottom and top of buildings, energy audit and certification, November 2012th
  • Commercial building “Euro Daus”, Split, energy audit, December 2012th
  • The office building of the city administration, Solin, energy audit and certification, December 2012th
  • Commercial building Plovput (Harbour Master), Split, energy audit, December 2012th
  • Commercial building PRIMA city, Split, Energy Report, January 2013.
  • Commercial building PRIMA 3, Split, Energy Report, January 2013.
  • Office building CITY CENTER ONE, Split, Energy Report, March 2013.
  • Commercial building shopping center STUDENAC, Omis, Energy Report, March 2013.
  • Hotel and tourist complex “Jadran”, Seget Donji, Energy Report, March 2013.
  • Shopping center LIDL, 17 centers by the Republic of Croatia, energy audit and certification March-April 2013.
  • Commercial building Plovput (VTS), Split, Energy Report, March 2013.
  • Hotel “Horizont”, Baska Voda, Energy Report, June 2013.
  • Commercial building in Kavanjinovoj 12, Split, energy audit, April 2013.
  • Hotels within “Adriatiq” groups, energy audits and certifications, June 2013 to January 2014.
  • Commercial building “Čebulc”, Dubrovnik, Energy Report, July 2013.
  • Business skyscraper “Jadran” in Split, Energy Report, June 2013.
  • Office buildings “Intereuropa”, 9 centers by Croatia, May to July 2013.
  • Commercial building “Overseas”, Split, energy audit, September 2013.
  • Shopping center SPIONA, Čibaća, energy audit and certification, Nov-prosinac 2013.
  • Hotel “Atrium”, Split, energy audit and certification, Nov-prosinac 2013.
  • Business building “McDonald’s”, 5 facilities Croatia, December 2013.
  • Commercial building “MPB pintar” Sirobuja January 2014.
  • Port of Split, February 2014.
  • Shopping center Joker in Split, April 2014.
  • Office buildings “Lesnina” 5 facilities Croatia, March – kolovoz 2014.
  • Commercial building “Poljud 3”, Split, energy audit and certification, June 2014.
  • Office buildings TOMMY, 9 of facilities at RH, May – kolovoz 2014.

HOUSING (PRIVATE) BUILDINGS

  • Apartments in residential buildings, 3 pieces, energy audit and certification, September 2013 – January 2014.
  • Residential building, Vukovarska 117, Split, Energy Report, November 2013.
  • Residential building “Maple”, Podstrana, Energy Report, December 2013.

LIGHTING SYSTEM

  • The municipality Klis, March 2014.
  • Municipality of Promina, April 2014.
  • Municipality Unešić, April 2014.
  • Municipality of Bale, May 2014.
  • Municipality of Brtonigla, June 2014.
  • Municipality of Vižinada, July 2014.
  • Municipality of Barban, August 2014.
  • Municipality of Tinjan, October 2014.
  • Municipality of Vižinada, November 2014.
  • Municipality of Marina, Februray 2015.
  • Municipality of Lastovo, March 2015.
  • Municipality of Nerežišća, March 2015.
  • Municipality of Marina, february 2015.
  • Municipality of Lastovo, march 2015.
  • Municipality of Nerežišća, march 2015.

Split, studeni /november 2019.